The UC Davis Health System Parking Structure 3 project is a 417,000 SF, design-build, seven-level, 1,200-space parking structure. The project included site demolition, site improvements and utilities. The exterior skin is comprised of a metal louver system affixed to the exterior beams and girders and includes at 145 kw photovoltaic array at the roof level, outdoor courtyard plaza, and canopies connecting the parking structure to the hospital. The structure is composed of white pre-cast concrete panels, pre-finished extruded aluminum shade louvers on the facade, and a glass-backed elevator tower. In addition, McCarthy added access and revenue control systems, space counting and license plate recognition. Environmental elements include a Photovoltaic Power System and 14 electric vehicle charging stations. The PV system currently provides 145 kilowatts of power to the main hospital
Walnut Creek BART Transit Village Parking Structure
Nestled between the active BART tracks and Highway 680, a 344,433-square-foot, 912-stall parking and transportation facility serving the BART Transit Village