Central Utility Building

Fremont, CA

Central Utility Building

Scalable Infrastructure for Next-Generation Manufacturing

Fremont, CA

The project involves the construction of a two-story Central Utility Building (CUB) and significant infrastructure upgrades. A key component of this development is the construction of a utility bridge that will connect to the RGL, alongside the installation of gas distribution systems for Phase 2A rows T&U, all within an operational cleanroom environment. To enhance electrical capacity, the project includes the addition of a substation, switchgears, and distribution systems. Furthermore, the integration of process chilled water capacity is achieved through the installation of two chillers, cooling towers, and a water treatment skid, ensuring optimal cooling efficiency. The project includes the installation of scrubber exhaust systems and an increase in hot water capacity with the addition of three boilers to manage emissions. The enhancements are designed to improve operational efficiency and contribute to the facility’s long-term sustainability objectives.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet consectetur adipiscing elit dolor

Other Related Projects

Want to explore McCarthy projects nationwide?

VISIT OUR McCARTHY WEBSITE